AFMSS II
The Automated Fluid Minerals Support System (AFMSS) is a BLM-wide fluid minerals (oil, gas, and geothermal) authorized use and inspection/enforcement workload support system. AFMSS core data includes…
Oil and Gas include geothermal resources and helium.
NOTE: Materials available from these pages are contributed by BLM staff. The collections are being developed and may be an incomplete baseline of relevant content. It is expected that each collection will continue growing in time to reflect the most current information available.
The Automated Fluid Minerals Support System (AFMSS) is a BLM-wide fluid minerals (oil, gas, and geothermal) authorized use and inspection/enforcement workload support system. AFMSS core data includes…
Merrill, M.D., Grove, C.A., Gianoutsos, N.J., and Freeman, P.A.
2023 U.S. Geological Survey Data Report 1167, 10 p.
Air Quality: "Dust control measures, as approved by the BLM [Bureau of Land Management], will be applied as appropriate. Water will be used to control dust, if necessary, as determined by the third…
2024, Fact Sheet 2024-3025
Wildlife Resource Protection: "If project activities are to occur during raptor mating/nesting season (March 1-August 31), surveys will be conducted during nesting season by qualified biologists to…
Wildlife Resource Protection: "If project activities are to occur during migratory birds typical nesting season (typically April 1st -July 315t), surveys will be conducted during nesting season by…
2008 BLM BMP Award to BP: "If drilling near sensitive wildlife areas, construct central production and storage facilities outside and away from areas of environmental interest."
Oil and Gas Well Development: General: "Please contact (pertinent NRS), Natural Resource Specialist, @ (307) 6841100, Bureau of Land Management, Buffalo, if there are any questions concerning the…
"Operators would work with the BLM [Bureau of Land Management], SHPO [State Historic Preservation Officer], and ACHP [Advisory Council on Historic Preservation] in developing and implementing…
Expanding hydrocarbon extraction, with its reliance on fresh water sources to stimulate production wells, is providing impetus for developing methods to recycle and reuse produced
Soils and Vegetation: "Disturbed areas, where a site will not naturally revegetate in a reasonable time or areas where soil stability is threatened by operations will be reseeded using a seed mix…
This is the course catalog view.
"...fences, where necessary, would meet BLM [Bureau of Land Management] and WGFD [Wyoming Game and Fish Department] specifications for facilitating wildlife movement."
The Geospatial Gateway is BLM staff's one-stop shop for your geospatial needs. Find links to Data, Map Services, Citrix, EGIS & GIS Help, National Projects and other helpful resources. Geospatial…
Analysis of Population Estimate Methods and Impacts in Areas with Energy Development: Annual Monitoring Program: "Surveys can be conducted by air or on the ground, as deemed appropriate by the BLM …
The BLM National Science Committee supported a project to develop a structured, repeatable method for identifying potential priority science needs for BLM based on multiple lines of evidence.
The Bureau of Land Management (BLM) will implement an adaptive management process for the Jonah Infill Drilling Project Area (JIDPA) that will follow the framework described in this appendix …
RP-2 STIPULATION IMPORTANT SEASONAL WILDLIFE HABITAT: "In order to protect important seasonal wildlife habitat, exploration, drilling and other development activity will be allowed only during the…
2008 BLM BMP Award to BP: "Surface and noise impacts from site construction, truck traffic and road construction can be minimized by drilling and completing multiple wells from a single pad."
2008 BLM BMP Award to Devon Energy Corporation: "Surface and noise impacts from site construction, truck traffic and road construction can be minimized by drilling and completing multiple wells from…
Circular 1489
Energy Resources Program
NM-6 CONTINENTAL DIVIDE TRAIL: "No occupancy or other surface disturbance will be allowed within 1000 feet of the Continental Divide National Scenic Trail Treadway. This distance may be modified when…
RP-8 TIMING LIMITATION STIPULATION: "No surface use is allowed during the following time period(s). This stipulation does not apply to operation and maintenance of production facilities. In order to…
"Operators would notify the BLM [Bureau of Land Management], USFWS [U.S. Fish and Wildlife Service], and WGFD [Wyoming Game and Fish Dept.] immediately if raptors are found nesting on project…
Lupardus, R.C., Simonsen, J., Toevs, G., Sterling, B., Bowen, Z.H., Davidson, Z., Hanser, S.E., Kachergis, E., Laurence-Traynor, A., Lepak, N., Mann, R.K., Nafus, A., Pilliod, D.S., and Duniway, M.
Scientific Investigations Report 2017-5070-C
"Water and Soil Management: 3) Hydrostatic test water will be discharged in a controlled manner onto an energy dissipater and within existing ROWs. The water is to be discharged onto undisturbed land…
2008 BLM BMP Award to Devon Energy Corporation: "For oilfield equipment requiring only small amounts of output power, install solar panels to reduce carbon emissions."
2008 BLM BMP Award to BP: "Use specialized completion techniques to defer initial gas production to treatment facilities rather than flaring it into the atmosphere to reduce emissions of harmful…
2008 BLM BMP Award to Devon Energy Corporation: "Use specialized completion techniques to defer initial gas production to treatment facilities rather than flaring it into the atmosphere to reduce of…
2006 BLM BMP Award to Shell: "Better drill site reclamation by replanting native plant species"
Cultural Resources: "If other cultural resources are discovered during operations, the findings will be immediately reported to the BLM [Bureau of Land Management] and/or state. Work that would…
2023, Fact Sheet 2022-3088
Gregory C. Delzer, Max Post van der Burg
Safety: "Shot holes will be distanced from wells and high-pressure pipelines by a distance of at least 202 feet if using a 15-pound charge (BLM [Bureau of Land Management] Handbook H-3150-1,…
Oil and Gas Lease Stipulations: Controlled or Limited Surface Use Stipulation: "Use or occupancy will be restricted only when the Bureau of Land Management and/or the surface management agency…
2008 BLM BMP Award to BP: "For lower power oil field application use Stirling-cycle generators to reduce both greenhouse gas emissions and noise on well site."
The newsletter highlights the science that we are conducting within our Center on energy and mineral resources and environmental issues.
"Wellhead compressors that are powered by natural gas emit NOx and VOCs [volatile organic compounds] (which contribute to ground-level ozone) and carbon monoxide. According to the federal Bureau of…